Marine Wetland Park name, logo design and construction planning scheme award announcement
Zhanjiang Haidong New Area Dragon King Bay Marine Wetland Park name, logo design and construction planning scheme award announcement
一. Project brief
The Dragon King Bay Marine Wetland Park (temporary name) in the new area of Haidong new area is located in the area of dragon King Bay in Haidong New District, Zhanjiang, Guangdong province. It is located in the center of Zhanjiang and the East Bank of Zhanjiang harbour. Its location is unique and its advantages are obvious. The surrounding layout includes Haidong national high tech Zone, Haidong Headquarters Economic Zone, national key project of marine development and Zhanjiang. Olympic Sports Center, Dragon King bay haven, Zhanjiang East high-speed rail station, etc. The total planning area of the project is about 3500 mu, of which the sea area is about 1500 mu, the land area is 150 mu, the beach area is about 1800 mu, and the coastline is about 7.1 km long.
The collection aims to collect the name, logo design and constructive planning of marine Wetland Park, and plagiarism is strictly prohibited. After the award, the works will be owned by the owner. The constructive planning scheme must have advanced international ideas, integrating the cultural characteristics of Zhanjiang and integrating into the local elements of Zhanjiang. It is necessary to take the oceans and wetlands as the theme, to promote the harmonious symbiosis between human and nature, and to create the landmark marine ecological landscape of Zhanjiang.
The right to explain this collection activities is owned by the owner.
二. Project positioning
The Dragon King Bay Marine Wetland Park is the key project of the Guangdong coastal comprehensive demonstration area, resolutely implement the new development concept, steadfastly make coordinated development plans for land and sea and give priorities to the ecological system, in order to build national marine Wetland Park, 5A level scenic area, and the Zhanjiang five island one Bay Tourism gathering area with the best features of sea is China as the target.
三. The main contents of the project construction
(1) comprehensive protection and utilization of the coastal zone; (2) the ecological protection of the island, such as the independent protection of Baisha island; (3) the protection and utilization of the existing wetland; (4) the development of the coastal ecotourism, such as the creation of a subtropical sea of flowers or forest belt, and the later use of the green road to carry out the mini marathon races; 5. Supporting infrastructure, Guest Center (parking lot, convenience store and so on), five island one bay wharf construction, popular science exhibition hall (delimit a separate area for marine wetland science popularization, sea oil drilling science popularization, navy military theme science popularization, marine equipment exhibition field).
四 The rules of the project award
(一) Evaluation criteria
1. The standard of project name and logo design evaluation
(1) The popularity and identification of the works;
(2) The innovation, artistry and uniqueness of the works;
(3) The connotation of the works is profound.
2. Evaluation criteria for project construction plan
(1) the innovation and originality of the scheme;
(2) the rationality and feasibility of the scheme;
(3) conform to the requirements of the contents of the project construction, and conform to the relevant norms of the state and Zhanjiang.
(4) the principles of sustainable design, construction and operation.
(二) Bonus setting
1) the project name and logo design awards are set for the top ten prize and the total bonus is 300 thousand yuan.
The first prize: 100 thousand yuan,the second prize: 70 thousand yuan, the third prize: 50 thousand yuan, the fourth prize:30 thousand yuan, the fifth prize. 20 thousand yuan, the sixth prize: 10 thousand yuan, the seventh prize: 8 thousand yuan, the eighth prize: 6 thousand yuan, the ninth prize: 4 thousand yuan, the tenth prize: 2 thousand yuan.
2) there are five major awards for the projects constructive planning, and the total bonus is 5 million 800 thousand yuan.
The first prize is 2 million 500 thousand yuan and 1, the two prize is 1 million 500 thousand yuan, 1, three prize 800 thousand yuan 1, four prize 600 thousand yuan 1, and each of them could be given to only one person.
3) the explanation of the bonus
The bonus of the award works of the project name, the logo design and the construction plan is the pre tax bonus. The tax and fee of the enterprise participants are paid by themselves. The tax and fees for the participants of the individual and social groups are withheld by the owner.
(三) evaluation procedure
1) project name and logo design
Selection time: June 16th, 2018 - July 15th, 2018
Publication and awards: September 1st, 2018 -September 5th, 2018
2) project construction plan
Selection time: August 20th, 2018 -August 30th, 2018
Publication and awards: September 1st, 2018 - September 5th, 2018
3) project name, logo design and project construction plan.
The entries are all set up by three points, such as public vote, experts evaluation and owners review. The scores are all 100 points, and the results are based on the weighted average score (public vote 30%, experts review 50%, and owners review 20%).
五. The beginning and ending time of the project collection
1. The beginning and ending time of the project name and logo design: May 16th, 2018 -June 16th, 2018 at 23:30
2. The starting and ending time of the project planning plan: May 16th, 2018 -August 16th, 2018 at 23:30
六.contact information and contribution mailbox
Tel: 0759-3968599 0759-3968617 Mr. Tsang;
Mailbox: lww3968599@qq.com
七. Appendix to the registration form
1. Application form for the name and logo design of the Dragon King Bay Marine Wetland Park (temporary name) in Haidong new area.
2. Application form for the construction plan of the Dragon King Bay Marine Wetland Park (tentative name) in Haidong new area.
八. Instructions for project collection activities.
1, Haidong New Area Dragon King Bay Marine Wetland Park (temporary name) name, logo design registration application notes
2, the Haidong New Area Dragon King Bay Marine Wetland Park (provisional name) construction planning plan collection application notes
九.application form and collection activitiess download address (please scan the two-dimensional code)
http://gd.qq.com/cross/20180509/U011OOD2.html (二維碼自動識別)
Zhanjiang New Area Investment Development Co., Ltd.
May 16, 2018
??x[R~ ??
推薦閱讀:
※建築設計基礎課:立體構成的四大設計方法
※致建築行業的學生
※好天才的建築書籍哈哈哈哈哈哈哈哈
※由山脈形式到城市街區規劃
※這群年輕人沒有完成一個建築,卻在設計史上如同神話